Your Position:Home>Products>Welded>SAWL...

SAWL Submerged-Arc Longitudinal Welded Austenitic /(Super) Duplex Stainless and Ni-based Alloy Steel Pipe

Contact Now

Summary:

Grade:TP304(L/H)/316(L)/310S/347(H)/S31803/S32205/S32750/S32760/N08904
Type: Welded
Material: Stainless /Nickel-based alloy steel
Welding process: Submerged-Arc Longitudinal Welded

Product Information:

Continuous Process

(Small O.D.)


Bending Process

(Large O.D.)

Size Range

-O.D.

10~219 mm (1/8"~8")

-O.D.

219~2500 mm (8"~98")

-W.T.0.5~10 mm-W.T. 3~35 mm
Length-Random3~18 m-Fixed1.5 /2.0 /6.0 m
-FixedAs required
GradeTP304(L/H)/316(L)/310S/347(H)/S31803/S32205/S32750/S32760/N08904
TypeWelded

Material

Stainless /Nickel-based alloy steel

Section shapeRound
EndsPlain or Beveledplastic caps can be added on both sides

Standard

ASME/ASTM/EN


Settlement:

Min. Order

10 MT

Terms of paymentL/C, T/T, D/P
WeightWeigh-in or theoreticalIncotermsFOB, CFR, CIF, EXW, FCA


Inspection:

NDT

-Ultrasonic Test  for plate and welding seam

-Eddy Current Test

-Radiographic Test

-Hydrostatic test

-PMI & Surface hardness test


Destructive Test

-Composition analysis

C, Si, Mn, P, S, Cu, Ni, Cr, Mo, Ti, N, etc.

-Mechanical propert

Yield, Tensile, Elongation, Hardness, Impact, etc

-Process property

Flattening, Bending, Flaring, etc.


Package and delivery:

Surface

Bare, Black varnish or Light oiled

Transportation

Ocean

Port

Tianjin /Shanghai

Package

-O.D. 8" and above

Loose

-O.D. 8"(219.1mm) below

Bundle


Yangzhou Chengde Pipeline Equipment Co., Ltd. (shorted as CDPE) is a comprehensive solution provider of pipeline products, committed to providing seamless, welded pipe, pipe fittings, flanges and special metal material product packaging and supply services for owners, EPC companies and equipment manufacturers, simplifying the procurement management and delivery process for customers, and providing timely, high-quality and reliable pipeline products.


The company's service areas include oil and gas, petrochemical, LNG, offshore, electric power and other energy projects. CDPE has built a complete and competitive pipeline supply chain system based on the capabilities and qualifications of strategic partners. The core team of the company comes from well-known manufacturers such as Chengde Steel Pipe and Longtaidi Pipe Technology, with more than 15 years of experience in market development and supply chain integration, and strives to win the trust of customers with high-quality project delivery.

Please Leave Us A Message

* Please submit your inquiry information here,Customer service will reply within 24 hours

SAWL Submerged-Arc Longitudinal Welded Austenitic /(Super) Duplex Stainless and Ni-based Alloy Steel Pipe https://www.cdpiping.com/product/39.html

Contact
WhatsApp